Issaquah, WA · King County
Side Sewer As-Built Form
Contractors use this form to record side sewer as-built details, including the site address, permit numbers, and contractor and inspector signatures.
What this form is
The Side Sewer As-Built Form records side sewer project details, including the permit numbers, contractor information, site address, lot number, and signatures. The document does not state when the city requires it. It also includes a legend for sewer features and measurements.
Who needs it
Contractors completing side sewer as-built information for a project in Issaquah can use this form to provide project details and signatures.
How to submit it
Submit the form to Community Planning and Development, PO Box 1307, Issaquah, WA 98027, or contact CPD at 425-837-3100 or [email protected].
About notarization
This document is signed without a notary; the form provides spaces for contractor and inspector signatures, and the signer just signs and dates it.
How to submit this form
- 1
Download The Form
Download the Side Sewer As-Built Form PDF.
- 2
Complete The Project Details
Enter the date and time, permit numbers, contractor details, parcel or division number, lot number, and site address.
- 3
Sign The Form
Complete the contractor signature field; the form also includes a space for the inspector’s signature.
- 4
Submit To The City
Send the form to Community Planning and Development at the listed Issaquah mailing address.
Frequently asked questions
- What does the Side Sewer As-Built Form record?
- It records permit numbers, contractor information, site and lot details, date and time, and contractor and inspector signatures. A legend identifies sewer features and measurements.
- Who uses this form?
- Contractors completing side sewer as-built information can use the form to provide project details and signatures.
- Do I need a notary for the Side Sewer As-Built Form?
- No. This document is signed without a notary; it provides spaces for contractor and inspector signatures, and the signer just signs and dates it.
- How do I submit the Side Sewer As-Built Form?
- Submit it to Community Planning and Development at PO Box 1307, Issaquah, WA 98027. The form also lists CPD’s phone number and email address.
Need something notarized?
This Side Sewer As-Built Form doesn’t need a notary — but if you have another Issaquah form that does, a commissioned online notary can help.
