Sign Permit Application
This application is for property owners or authorized agents seeking a Redmond sign permit and collects applicant, contractor, site, and sign details.
What this form is
Use this application to request a Redmond sign permit and provide information about the applicant, contractor, sign location, and proposed sign. The form asks for sign dimensions, type, quantity, and construction value, and includes a checklist of required drawings, plans, and photos. It also notes that illuminated signs require an electrical permit and that tenants need a Redmond business license before a sign permit is issued.
Who needs it
Property owners or authorized agents applying for a sign permit in Redmond should complete this application and provide the required plans and photos.
How to submit it
Apply for sign permits through Redmond’s ePermitting portal, REPS: Civic Access. The form says paper plans and courier-delivered applications are not accepted.
About notarization
This application does not require a notary; the authorized applicant signs and dates the certification.
How to submit this form
- 1
Download the Application
Download the Sign Permit Application and review its fields and checklist.
- 2
Complete the Application
Provide applicant, contractor, site, sign, and construction-value information, then sign and date the certification.
- 3
Gather Required Plans
Prepare the required drawings, site plan when applicable, and building-elevation photos. Follow the listed electronic plan standards.
- 4
Apply Through the Portal
Apply for the sign permit through Redmond’s REPS: Civic Access ePermitting portal.
Frequently asked questions
- Do I need a notary for the Sign Permit Application?
- No. This application does not require a notary; the authorized applicant signs and dates the certification.
- How do I submit the Sign Permit Application?
- Apply through Redmond’s ePermitting portal, REPS: Civic Access. The form says paper plans and courier-delivered applications are not accepted.
- What plans and photos are required?
- The checklist calls for elevation drawings and building-elevation photos. Monument or freestanding signs also require a site plan and foundation and structural details.
- Do illuminated signs need another permit?
- Yes. The application states that illuminated signs require an electrical permit.