Sammamish, WA · King County

No notary required

State Environmental Policy Act (SEPA) Review Application

Sammamish property owners and applicants use this application to request SEPA review for a construction project and provide project and property details.

What this form is

Use this application to request a SEPA review related to a construction project, submitting it at the same time as the Construction Permit Application. The form collects owner, applicant, property, parcel, and critical-area information and requires signatures. The submittal checklist also lists supporting documents, including a project narrative, SEPA checklist, and plan set; some items are conditional.

Who needs it

Property owners or applicants seeking SEPA review related to a construction project submit this application with a Construction Permit Application.

How to submit it

Complete and save the form, then upload it with the required documents through MyBuildingPermit.com by selecting Sammamish and the SEPA only scope of work.

About notarization

This application is signed and dated without a notary; the listed supporting documents do not state that any attachment must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Sammamish State Environmental Policy Act (SEPA) Review Application.

  2. 2

    Complete And Sign

    Fill in the owner, applicant or representative, and property information, then sign and date the application.

  3. 3

    Gather Required Documents

    Prepare the documents listed in the submittal checklist, including conditional items when applicable.

  4. 4

    Submit To Sammamish

    Save the completed form and upload it with the required documents on MyBuildingPermit.com, selecting Sammamish and SEPA only.

Frequently asked questions

Do I need a notary for the SEPA Review Application?
No. The application asks the owner and, if applicable, the applicant or representative to sign and date it; it does not require notarization.
How do I submit the SEPA Review Application?
Complete and save the form, then upload it with the required documents to MyBuildingPermit.com. Select Sammamish and the SEPA only scope of work.
When should I submit this application?
For SEPA review related to a construction project, submit this application at the same time as a Construction Permit Application.
What supporting documents are listed?
The checklist includes a project narrative, title report, legal description, mailing list materials, SEPA checklist, and plan set, among other items. Some documents are required only if applicable or proposed.

Need something notarized?

This State Environmental Policy Act (SEPA) Review Application doesn’t need a notary — but if you have another Sammamish form that does, a commissioned online notary can help.