Centralia, WA · Lewis County
General Stormwater Review Worksheet
This worksheet helps project applicants identify stormwater management and erosion control requirements and provide site information for city review.
What this form is
The worksheet helps applicants determine which stormwater review category and on-site management or erosion control measures may apply to a project. It asks for applicant and site details, disturbed and impervious areas, site conditions, and proposed stormwater measures. Projects that meet the stated thresholds must also address the listed minimum requirements and submit a complete stormwater report for review and approval.
Who needs it
Applicants planning construction or land-disturbing activity can use this worksheet to assess stormwater review requirements for their project.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
No notary is required for this worksheet; it does not call for a notarized attachment or sworn step, and the worksheet text contains no signer signature step.
How to submit this form
- 1
Download The Worksheet
Download the General Stormwater Review Worksheet.
- 2
Complete Project Details
Provide applicant and site information, disturbed and impervious areas, zoning, and applicable site conditions.
- 3
Review Stormwater Requirements
Use the worksheet's thresholds and project details to identify the applicable stormwater review requirements.
- 4
Gather Supporting Materials
For projects requiring review, prepare the site plan and complete stormwater report described in the worksheet.
- 5
Submit To The City
Submit the worksheet to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What does the General Stormwater Review Worksheet do?
- It helps determine stormwater review categories and possible on-site management or erosion control measures, based on project area and site conditions.
- Who should use this worksheet?
- Applicants planning a project with construction or land-disturbing activity can use it to provide site details and assess which stormwater requirements may apply.
- Do I need a notary for the General Stormwater Review Worksheet?
- No. The worksheet does not call for notarization, a notarized attachment, or a sworn step, and its text contains no signer signature step.
- How do I submit the General Stormwater Review Worksheet?
- Submit it to the city department named on the form; check the city website for current contact details.
