Centralia, WA · Lewis County

No notary required

Single Family Residence/Small Project Stormwater Worksheet

This worksheet helps Centralia residents and contractors identify stormwater and erosion-control requirements for a single-family residence or small project.

What this form is

Use this worksheet for a single-family residence or small project to identify applicable stormwater management and erosion-control requirements. It asks for applicant and site details, disturbed and impervious areas, property features, and construction practices. The form also directs applicants to submit a site plan showing proposed structures, driveways, walkways, patios, and landscape areas.

Who needs it

Residents and contractors planning a single-family residence or small project can use the worksheet to determine applicable stormwater and erosion-control measures.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; it identifies a site plan to submit with the worksheet, with no sworn or notarized attachment specified.

How to submit this form

  1. 1

    Download The Worksheet

    Download the Single Family Residence/Small Project Stormwater Worksheet.

  2. 2

    Complete The Site Information

    Provide applicant and property details, disturbed and impervious areas, and information about relevant site features.

  3. 3

    Prepare The Site Plan

    Show proposed structures, driveways, walkways, patios, and landscape areas on a site plan.

  4. 4

    Submit The Worksheet

    Submit the worksheet and site plan to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Centralia stormwater worksheet determine?
It helps determine the onsite stormwater management and erosion-control measures required for a single-family residence or small project.
What information and attachments does the worksheet ask for?
It asks for applicant and site information, including disturbed and impervious areas, and directs you to submit a site plan showing proposed structures and site features.
Do I need a notary for the Centralia stormwater worksheet?
No. The worksheet is signed and dated without a notary. It identifies a site plan to submit with the worksheet but specifies no sworn or notarized attachment.
How do I submit the Centralia stormwater worksheet?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Single Family Residence/Small Project Stormwater Worksheet doesn’t need a notary — but if you have another Centralia form that does, a commissioned online notary can help.