Bonney Lake, WA · Pierce County

No notary required

Stormwater Pollution Prevention Plan (SWPPP) Abbreviated Plan Form

This fillable plan form is for a project manager coordinating construction of a single-family residence with less than 5,000 square feet of impervious or hard surfacing.

What this form is

The abbreviated Construction Stormwater Pollution Prevention Plan (SWPPP) is intended for use with construction of a single-family residence when the project will create less than 5,000 square feet of impervious or hard surfacing. The form records project and project manager information and asks the manager to describe stormwater controls, select best management practices, and acknowledge project management steps. It also includes a construction sequence and a project manager signature line.

Who needs it

A project manager coordinating construction of a single-family residence that will create less than 5,000 square feet of impervious or hard surfacing can use this plan.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This plan is signed without a notary; it provides a project manager signature line and does not identify any attachment or related step that must be sworn or notarized.

How to submit this form

  1. 1

    Download The Form

    Download the abbreviated Construction Stormwater Pollution Prevention Plan form.

  2. 2

    Complete Project Information

    Fill in the project details and project manager information, then describe the planned stormwater controls and select applicable best management practices.

  3. 3

    Review The Construction Sequence

    Review the listed construction sequence and explain any changes to the order that the project requires.

  4. 4

    Sign And Submit

    Have the project manager sign the form. Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the abbreviated SWPPP plan form for?
It is a construction stormwater pollution prevention plan for use with a single-family residence project that will create less than 5,000 square feet of impervious or hard surfacing.
Who completes the abbreviated SWPPP form?
The form identifies the project manager, usually the home builder, general contractor, or homeowner who coordinates construction, schedules subcontractors, and makes project decisions.
Do I need a notary for the abbreviated SWPPP plan form?
No. This plan is signed without a notary; it provides a project manager signature line and does not identify an attachment or related step that must be sworn or notarized.
How do I submit the abbreviated SWPPP plan form?
The document does not provide submission instructions. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Stormwater Pollution Prevention Plan (SWPPP) Abbreviated Plan Form doesn’t need a notary — but if you have another Bonney Lake form that does, a commissioned online notary can help.