Puyallup, WA · Pierce County

No notary required

Franchise Utility Application

Applicants proposing private utility work in Puyallup’s public right-of-way use this application to provide project details and request a franchise utility permit.

What this form is

The City requires this application for projects proposing private utility work in the public right-of-way, including utility poles, gas, power, communication lines, and cross bore inspections. It asks for applicant, contractor, site, and job information, and includes questions about open cuts and pipeline proximity. Applicants must sign the certification and upload applicable supporting documents, such as a site plan and traffic control plan.

Who needs it

Applicants proposing private utility work in Puyallup’s public right-of-way, including contractors handling that work, need to submit this application.

How to submit it

Create an account or sign in to the CityView Portal, select “Apply for an Engineering Permit,” then choose “Franchise Utility Permit.” Complete the online form and upload required documents; listed fees may apply.

About notarization

This application is signed without a notary; the applicant signs and dates a certification under penalty of perjury.

How to submit this form

  1. 1

    Download The Application

    Download the Franchise Utility Application PDF and review its submittal instructions.

  2. 2

    Complete The Application

    Enter applicant, contractor, site, and job details, answer the project questions, and sign and date the certification.

  3. 3

    Gather Required Attachments

    Prepare applicable supporting documents, such as a site plan, traffic control plans, and facility details and specifications.

  4. 4

    Submit Through The City Portal

    In the CityView Portal, select “Apply for an Engineering Permit,” choose “Franchise Utility Permit,” complete the online form, and upload the documents.

Frequently asked questions

What is the Franchise Utility Application for?
It is required for projects proposing private utility work in Puyallup’s public right-of-way, including utility poles, gas, power, communication lines, and cross bore inspections.
Who needs to complete this application?
Applicants proposing private utility work in the City’s public right-of-way provide project, site, applicant, and contractor information through this application.
Do I need a notary for the Franchise Utility Application?
No. The application has no notary block; the applicant signs and dates a certification under penalty of perjury.
How do I submit the Franchise Utility Application?
Use the CityView Portal: select “Apply for an Engineering Permit,” choose “Franchise Utility Permit,” complete the online form, and upload the required documents.

Need something notarized?

This Franchise Utility Application doesn’t need a notary — but if you have another Puyallup form that does, a commissioned online notary can help.