Roy, WA · Pierce County
Right of Way Permit
This permit application is for people or businesses seeking permission to excavate, cut, or perform other work in a Roy public street, alley, or public place.
What this form is
Use this application to request a permit before doing excavation, cutting, or other work in a public street, alley, or public place in Roy. It asks for the permittee’s contact and license details, the work and project information, and the work location. The application must include a plat showing the proposed work; a performance bond is required before the permit can be issued.
Who needs it
A person or business planning excavation, cutting, or other work in a Roy public street, alley, or public place needs to apply.
How to submit it
The application and plat are filed with the city for review by the director of public works; the performance bond is filed with the clerk-treasurer before permit issuance.
About notarization
This document is signed and dated without a notary; it calls for a plat and performance bond, but does not say either must be notarized or sworn.
How to submit this form
- 1
Download The Application
Download the Roy Right of Way Permit application.
- 2
Complete The Application
Provide the permittee’s details, work description, location, and project information requested on the form.
- 3
Prepare The Plat And Bond
Include a plat showing the proposed work and file the required performance bond with the clerk-treasurer before permit issuance.
- 4
Submit To The City
File the application and plat with the city for review by the director of public works.
Frequently asked questions
- What is the Roy Right of Way Permit for?
- It is an application for permission to excavate, cut, or perform other work in a public street, alley, or public place in Roy.
- What must I include with the application?
- The application instructions call for a plat showing the location and plan of the proposed work. A performance bond must be filed with the clerk-treasurer before the permit is issued.
- Do I need a notary for the Right of Way Permit?
- No. The application is signed and dated without a notary. It calls for a plat and performance bond but does not say either must be notarized or sworn.
- How do I submit the Right of Way Permit application?
- File the application and plat with the city for review by the director of public works. File the performance bond with the clerk-treasurer before permit issuance.
