North Bonneville, WA · Skamania County

No notary required

Application for Excavation or Construction Within City Right-of-Ways

This application is for individuals or companies requesting permission to perform excavation or construction work within a North Bonneville city right-of-way.

What this form is

Individuals or companies use this application to request permission for excavation or construction within a city right-of-way. It asks for the applicant, proposed work, work dates, location, company and contact details, and applicant signature; city approval fields are also provided. Applicants must notify the city before work starts and when it concludes, and attach drawings or images showing the work location and related details.

Who needs it

An individual or company seeking permission to excavate or construct within a North Bonneville city right-of-way needs this application.

How to submit it

The form lists City Contact at 541-400-8437 and requires city notification before work starts and at its conclusion. It also specifies 24-hour advance notice before work begins.

About notarization

This application is signed and dated without a notary; the requested drawings or images are attachments, and the form does not say they must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the North Bonneville application for excavation or construction within city right-of-ways.

  2. 2

    Complete The Application

    Provide applicant and company details, describe the work, list its dates and location, and sign and date the application.

  3. 3

    Attach Drawings Or Images

    Include drawings or images showing the work location and details needed for an adequate as-built record.

  4. 4

    Contact The City

    Use the City Contact number listed on the form, 541-400-8437, to arrange submission and provide required advance notice.

Frequently asked questions

Who uses the right-of-way excavation application?
An individual or company seeking permission to excavate or construct within a North Bonneville city right-of-way uses this application.
What information and attachments does the application request?
It asks for applicant and company details, work description, dates, location, phone number, and signature. Attach drawings or images showing the location and other details.
How do I submit the right-of-way excavation application?
The form lists City Contact at 541-400-8437. It says to notify the city 24 hours before work starts and again at the conclusion of the work.
Do I need a notary for this application?
No. Sign and date the application; the drawings or images requested as attachments are not stated to require notarization or a sworn statement.

Need something notarized?

This Application for Excavation or Construction Within City Right-of-Ways doesn’t need a notary — but if you have another North Bonneville form that does, a commissioned online notary can help.