Arlington, WA · Snohomish County

No notary required

Residential Photovoltaic Solar Panel Application

This application is for property owners or contractors seeking a City of Arlington building permit to install residential photovoltaic solar panels.

What this form is

The City of Arlington requires a building permit to install photovoltaic solar panels for residential use. The application asks for property, project, owner and contractor details, along with information about the existing roof structure, roof material, building size and stories. Applicants are directed to submit roof plans and construction documents, manufacturer installation specifications, and engineering documents if required.

Who needs it

A property owner or contractor applying for a City of Arlington building permit to install residential photovoltaic solar panels needs this application.

How to submit it

Submit electronic files for the listed documents to Community and Economic Development, City of Arlington, 18204 59th Ave NE, Arlington, WA 98223.

About notarization

This application is signed and dated without a notary; the document does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Application

    Download the Residential Photovoltaic Solar Panel Application.

  2. 2

    Complete The Application

    Enter the property, project, owner and contractor information, and provide the requested existing roof and building details.

  3. 3

    Gather Required Documents

    Prepare roof plans and construction documents, manufacturer installation specifications, and engineering documents if required.

  4. 4

    Submit Electronic Files

    Submit the electronic files to Community and Economic Development at the City of Arlington address shown on the form.

Frequently asked questions

Do I need a notary for the Residential Photovoltaic Solar Panel Application?
No. The application is signed and dated without a notary, and it does not identify any attachment or related step that must be notarized or sworn.
How do I submit the Residential Photovoltaic Solar Panel Application?
Submit electronic files for the listed documents to Community and Economic Development, City of Arlington, 18204 59th Ave NE, Arlington, WA 98223.
What documents are required with the application?
The form lists the City of Arlington Solar Panel Application, roof plan and construction documents, manufacturer installation specifications, and engineering documents if required.
What inspections does the form list?
Roof-mounted panels require at least two inspections: one to check the racking hardware and attachment, and a final inspection after the project is complete and Labor and Industries has approved the electrical.

Need something notarized?

This Residential Photovoltaic Solar Panel Application doesn’t need a notary — but if you have another Arlington form that does, a commissioned online notary can help.