Everett, WA · Snohomish County
Preliminary Short Subdivision Permit Checklist
Everett’s checklist helps property owners and applicants assemble the materials needed to submit a preliminary short subdivision permit application.
What this form is
Use this checklist when submitting an application for a preliminary short plat in Everett. It lists the Land Use Application, preliminary short plat map set, current title report, required declarations, preliminary drainage materials, applicable special studies, and the fee process. The checklist also notes that missing items may leave an application incomplete for intake review.
Who needs it
Property owners and applicants seeking a preliminary short plat in Everett should use this checklist to assemble their application materials.
How to submit it
Submit the checklist and required items online via Everett’s Online Permitting Portal. Applicable study shapefiles may be submitted to [email protected]; fees are requested once the application is deemed complete for intake review.
About notarization
This checklist is signed without a notary; the owner, applicant, or primary contact signs the Land Use Application, and no sworn or notarized attachment is listed.
How to submit this form
- 1
Download The Checklist
Download Everett’s Preliminary Short Subdivision Permit Checklist.
- 2
Complete The Land Use Application
Have the owner, applicant, or primary contact complete and sign the Land Use Application.
- 3
Gather Required Materials
Assemble the map set, title report, required declarations, drainage materials, and applicable special studies listed in the checklist.
- 4
Submit Online
Submit the checklist and application materials through Everett’s Online Permitting Portal.
Frequently asked questions
- Do I need a notary for the Preliminary Short Subdivision Permit Checklist?
- No. The checklist does not require notarization; the owner, applicant, or primary contact signs the Land Use Application, and no sworn or notarized attachment is listed.
- How do I submit the preliminary short subdivision materials?
- Submit the checklist and required items online through Everett’s Online Permitting Portal. Applicable special-study shapefiles may be submitted to [email protected].
- What materials does the checklist ask for?
- It lists a signed Land Use Application, preliminary short plat map set, current title report, required declarations, preliminary drainage materials, applicable special studies, and a fee.
