Monroe, WA · Snohomish County

No notary required

High Piled Combustible Storage

This checklist helps property owners and applicants prepare a Fire Construction Permit submittal for high-piled combustible storage in Monroe.

What this form is

Use this document when applying for a Fire Construction Permit to install or modify a structure exceeding 500 square feet, including aisles, for high-piled combustible storage. It requests site and project details and lists application materials and plan information, including storage layout, commodities, aisles, fire protection systems, and access features. A separate building permit is required to install racking, and fire-suppression system modifications may require an additional permit.

Who needs it

Applicants seeking a Fire Construction Permit for high-piled combustible storage in Monroe should use this checklist to prepare their submittal.

How to submit it

The document lists [email protected] and headquarters at 163 Village Court, Monroe, WA 98272. It does not specify a submission method; check with the fire marshal for current instructions.

About notarization

No notary is required; the document mentions no sworn attachment or related step, and the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Checklist

    Download the High Piled Combustible Storage PDF.

  2. 2

    Complete Project Information

    Fill in the site address, associated permits, project name or tenant, and property owner.

  3. 3

    Gather Required Materials

    Prepare the completed Fire Construction permit submittal application, this checklist, and the plans and documents described in the checklist.

  4. 4

    Submit To The Fire Marshal

    The document lists [email protected] and a Monroe headquarters address; confirm current submission instructions with the fire marshal.

Frequently asked questions

What is the High Piled Combustible Storage checklist for?
It lists project information, application materials, and plan details for a Fire Construction Permit submittal for high-piled combustible storage.
Who uses this checklist?
Applicants preparing a Fire Construction Permit submittal for high-piled combustible storage in Monroe use it to identify required documents and plan details.
Do I need a notary for the High Piled Combustible Storage checklist?
No. This document does not require notarization and lists no sworn attachment or related step; the signer just signs and dates it.
How do I submit the High Piled Combustible Storage checklist?
The document lists [email protected] and headquarters at 163 Village Court, Monroe, WA 98272, but does not specify how to submit. Check with the fire marshal for current instructions.

Need something notarized?

This High Piled Combustible Storage doesn’t need a notary — but if you have another Monroe form that does, a commissioned online notary can help.