Monroe, WA · Snohomish County
Plant Extraction Systems
This checklist helps applicants prepare a fire construction permit application for installing or modifying a plant extraction system in Monroe.
What this form is
The checklist identifies materials required with a fire construction permit application to install or modify a plant extraction system, including plans, equipment information, and a technical report. It also lists plan details and technical report contents for review. The document serves Lake Stevens, Monroe, and Sultan; it says applicants are responsible for verifying that marijuana processing is allowed in the city where they apply.
Who needs it
Applicants seeking a fire construction permit to install or modify a plant extraction system in Monroe should use this checklist.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is signed without a notary; the checklist and its listed supporting materials do not require a notarized or sworn attachment.
How to submit this form
- 1
Download The Checklist
Download the Plant Extraction Systems PDF and review the fire construction permit submittal requirements.
- 2
Complete The Required Materials
Prepare the permit application and checklist, plans, manuals, listing information, technical report, and appliance specification sheets.
- 3
Gather Plan And Report Details
Include the required plan information and technical report contents described in the checklist.
- 4
Submit To The City
Submit the materials to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What is the Plant Extraction Systems checklist for?
- It lists information and supporting materials for a fire construction permit application to install or modify a plant extraction system.
- What materials does the checklist identify?
- It calls for a completed permit application and checklist, plans, the manufacturer's installation and operation manual, system listing information, a technical report, and appliance specification sheets.
- Do I need a notary for the Plant Extraction Systems checklist?
- No. This document is signed without a notary, and it does not identify a notarized or sworn attachment.
- How do I submit the Plant Extraction Systems checklist?
- Submit it to the city department named on the form; check the city website for current contact details.
