Monroe, WA · Snohomish County

No notary required

Plant Extraction Systems

This checklist helps applicants prepare a fire construction permit application for installing or modifying a plant extraction system in Monroe.

What this form is

The checklist identifies materials required with a fire construction permit application to install or modify a plant extraction system, including plans, equipment information, and a technical report. It also lists plan details and technical report contents for review. The document serves Lake Stevens, Monroe, and Sultan; it says applicants are responsible for verifying that marijuana processing is allowed in the city where they apply.

Who needs it

Applicants seeking a fire construction permit to install or modify a plant extraction system in Monroe should use this checklist.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the checklist and its listed supporting materials do not require a notarized or sworn attachment.

How to submit this form

  1. 1

    Download The Checklist

    Download the Plant Extraction Systems PDF and review the fire construction permit submittal requirements.

  2. 2

    Complete The Required Materials

    Prepare the permit application and checklist, plans, manuals, listing information, technical report, and appliance specification sheets.

  3. 3

    Gather Plan And Report Details

    Include the required plan information and technical report contents described in the checklist.

  4. 4

    Submit To The City

    Submit the materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Plant Extraction Systems checklist for?
It lists information and supporting materials for a fire construction permit application to install or modify a plant extraction system.
What materials does the checklist identify?
It calls for a completed permit application and checklist, plans, the manufacturer's installation and operation manual, system listing information, a technical report, and appliance specification sheets.
Do I need a notary for the Plant Extraction Systems checklist?
No. This document is signed without a notary, and it does not identify a notarized or sworn attachment.
How do I submit the Plant Extraction Systems checklist?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Plant Extraction Systems doesn’t need a notary — but if you have another Monroe form that does, a commissioned online notary can help.