Monroe, WA · Snohomish County

No notary required

Solar Photovoltaic Power Systems Submittal Checklist

This checklist helps property owners and project applicants prepare fire construction permit materials for installing or modifying a solar photovoltaic power system.

What this form is

The checklist outlines information and supporting documents required for a Fire Construction Permit to install or modify a solar photovoltaic power system. It asks for project and site details, building occupancy and fire sprinkler information, roof and site plans, and array panel specification sheets. Photos of the completed panel installation must be provided before requesting a final inspection.

Who needs it

Property owners or project applicants installing or modifying a solar photovoltaic power system should complete this checklist for the Fire Construction Permit submittal.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the signer just completes the checklist and provides the required permit materials.

How to submit this form

  1. 1

    Download The Checklist

    Download the Solar Photovoltaic Power Systems Submittal Checklist PDF.

  2. 2

    Complete Project Information

    Fill in the site address, associated permits, project name or tenant, and property owner.

  3. 3

    Gather Required Materials

    Prepare the completed Fire Construction permit application, plans, and array panel specification sheets showing compliance with UL 1703 and 2703.

  4. 4

    Submit To The City

    Submit the checklist and required materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What is the Solar Photovoltaic Power Systems Submittal Checklist?
It lists project details, plans, and supporting documents required for a Fire Construction Permit to install or modify a solar photovoltaic power system.
Who should complete the solar photovoltaic checklist?
The project applicant or property owner preparing a Fire Construction Permit submittal for a solar photovoltaic system should complete the checklist.
How do I submit the solar photovoltaic checklist?
Submit it to the city department named on the form; check the city website for current contact details.
Do I need a notary for the solar photovoltaic checklist?
No. This document is signed without a notary; the signer just completes the checklist and provides the required permit materials.

Need something notarized?

This Solar Photovoltaic Power Systems Submittal Checklist doesn’t need a notary — but if you have another Monroe form that does, a commissioned online notary can help.