Monroe, WA · Snohomish County

No notary required

Temporary Membrane Structures and Tents

This checklist identifies permit application materials and plan details required for temporary tents and membrane structures submitted for fire construction permit review.

What this form is

Use this checklist when applying for a Fire Construction Permit to install or modify a temporary membrane structure or tent covered by the document. It lists application materials, supporting certificates and affidavits, structural documentation, and site and floor plan details required for review.

Who needs it

Applicants seeking a Fire Construction Permit for a temporary tent or membrane structure should use this checklist to prepare their submittal.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed without a notary; the checklist asks for an affidavit or affirmation, but does not say it must be notarized.

How to submit this form

  1. 1

    Download The Checklist

    Download the Temporary Membrane Structures and Tents checklist PDF.

  2. 2

    Complete Project Information

    Provide the site address, associated permits, project name or tenant, and property owner.

  3. 3

    Gather Required Documents

    Prepare the permit application, checklist, plans, required certificates or affidavits, and structural documentation when applicable.

  4. 4

    Submit To The City

    Submit the checklist and supporting materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Temporary Membrane Structures and Tents checklist?
No. This document has no notary block and does not say notarization is required. It does list an affidavit or affirmation as a submittal item, without specifying that it must be notarized.
How do I submit the Temporary Membrane Structures and Tents checklist?
The document does not give a submission method. Submit it to the city department named on the form; check the city website for current contact details.
What permit is this checklist for?
It is for a Fire Construction Permit to install or modify temporary membrane structures and tents.
What plans does the checklist call for?
It lists site and floor plans, with details varying by occupant load. The plan requirements include exits, seating, equipment, fire extinguishers, access roads, and structure locations.

Need something notarized?

This Temporary Membrane Structures and Tents doesn’t need a notary — but if you have another Monroe form that does, a commissioned online notary can help.