Spokane Valley, WA · Spokane County

No notary required

Commercial Construction Application

Property owners or authorized applicants use this application to provide project details for commercial construction, tenant improvements, or changes of occupancy in Spokane Valley.

What this form is

This application provides project and contact details for commercial construction, tenant improvements, changes of occupancy, or other work at a listed site address. It asks for owner, contractor, architect, and tenant information, a work description, building and occupancy details, and project cost. The applicant signs and dates the form and acknowledges permit conditions; plans or additional information may be required before processing.

Who needs it

Property owners or authorized applicants seeking a permit for commercial construction, tenant improvements, a change of occupancy, or other work use this application.

How to submit it

The form lists the Permit Center at 10210 E Sprague Avenue, Spokane Valley, WA 99206, and [email protected]; it does not state a submission method.

About notarization

This application is signed and dated without a notary; plans or additional information may be required, but the form does not say they must be notarized.

How to submit this form

  1. 1

    Download The Application

    Download the Commercial Construction Application PDF.

  2. 2

    Complete The Form

    Enter the site, owner, contractor, architect, and tenant details, describe the work, provide building and project information, then sign and date.

  3. 3

    Gather Additional Information

    The form notes that plans or additional information may be required before the application can be processed.

  4. 4

    Submit To The City

    Use the Permit Center address or email listed on the form; the document does not specify a submission method.

Frequently asked questions

What projects does the Commercial Construction Application cover?
The form lists new construction, tenant improvement, change of occupancy, and other work. It asks for the project site address, scope, building details, and cost.
Who fills out this application?
The applicant provides project and contact details and signs the application. The form states the applicant must be the property owner or have permission and authority to represent the owner.
Do I need a notary for the Commercial Construction Application?
No. The form calls for an applicant signature and date, not notarization. It says plans or additional information may be required but does not say those materials must be notarized.
How do I submit the Commercial Construction Application?
The form lists the Permit Center address at 10210 E Sprague Avenue, Spokane Valley, WA 99206, and [email protected]. It does not specify how to submit the application.

Need something notarized?

This Commercial Construction Application doesn’t need a notary — but if you have another Spokane Valley form that does, a commissioned online notary can help.