This application is for anyone seeking City of Kettle Falls approval to excavate or perform utility work in a city right-of-way.

What this form is

Use this application to request a permit before occupying or working on a City of Kettle Falls road, street, alley, public place, or structure. It asks for applicant and adjacent property owner contact details, project location and schedule, work description, and affected utilities. Include drawings showing the proposed work and its location; the city must approve the work location before work begins.

Who needs it

Applicants planning excavation or utility work on a City of Kettle Falls road, street, alley, public place, or structure need to file this application.

How to submit it

File the application with the City before performing the work, accompanied by drawings showing the proposed work and location. The form lists the Public Works Department at 580 Meyers St, Kettle Falls, WA 98141, and a mailing address of P.O. Box 457, Kettle Falls, WA 99141.

About notarization

This application is signed and dated without a notary; the signer affirms that the submitted answers and information are accurate.

How to submit this form

  1. 1

    Download The Application

    Download the Right-of-Way Excavation Permit application.

  2. 2

    Complete The Application

    Provide applicant and adjacent property owner details, project and site information, and affected utilities.

  3. 3

    Gather Required Drawings

    Include drawings showing the work location, road details, and the proposed work relative to existing utilities.

  4. 4

    Submit To The City

    File the application and drawings with the City before performing the work.

Frequently asked questions

Do I need a notary for the Right-of-Way Excavation Permit?
No. This application is signed and dated without a notary. The signer affirms that the answers and information submitted are accurate.
How do I submit the Right-of-Way Excavation Permit?
File the application with the City before performing the work and include drawings showing the proposed work and location. The form lists the Public Works Department and a mailing address.
What information does the application ask for?
It asks for applicant and adjacent property owner contact details, the project location and schedule, a project description, and affected utilities.
What drawings must accompany the application?
The application calls for drawings to a working scale showing the work location, road details, and the work's position relative to existing utilities.