Blaine, WA · Whatcom County
Final Plat Application
Property owners or their authorized representatives use this application to request City of Blaine review and approval of a final long plat.
What this form is
This application requests approval of a final plat, the last step in the long-plat process that divides land into lots available for sale. Applicants must already have preliminary plat approval and submit the application with the required fee and supporting materials, including draft plat maps, as-built drawings, an engineer’s completion statement, and a current title report. The city reviews compliance with preliminary plat approval conditions before City Council review.
Who needs it
Property owners with preliminary plat approval who are seeking final approval of a long plat in Blaine need this application.
How to submit it
Applications must be submitted electronically by emailing materials to [email protected]. Submit the applicable fee listed in the City of Blaine Unified Fee Schedule.
About notarization
This application is signed and dated without a notary; the form does not specify a notarized or sworn attachment, so the signer just signs and dates it.
How to submit this form
- 1
Download The Application
Download the Final Plat Application and review its instructions and application requirements.
- 2
Complete And Sign
Fill in the application and have the owner or an authorized representative sign it.
- 3
Gather Required Materials
Prepare the required draft plat maps, supporting documents, and applicable fee.
- 4
Email The Application
Email the application materials to [email protected].
Frequently asked questions
- Do I need a notary for the Final Plat Application?
- No. This application is signed and dated without a notary, and the form does not specify a notarized or sworn attachment.
- How do I submit the Final Plat Application?
- Submit the application materials electronically by email to [email protected], as directed on the form.
- What must be submitted with the application?
- The form lists draft final plat maps, as-built civil drawings, an engineer’s statement of at least 80-percent completion, a current title report, lot closure calculations, and other supporting materials.
- Do I need preliminary plat approval first?
- Yes. The application instructions say you must have preliminary plat approval from the City before applying for a final plat.
