Sahuarita, AZ · Pima County
Right-of-Way Use Application
Contractors and other applicants use this application to request permission to perform work in the Town of Sahuarita’s public right-of-way.
What this form is
The Town of Sahuarita uses this application to review requests for work in the public right-of-way, such as trenching, boring, or traffic control setup. Applicants provide project, contractor, and contact details, describe the work, and provide proposed start and end dates. The application calls for a site location map, a cost estimate, traffic control plans when necessary, and applicable checklist items.
Who needs it
Applicants planning work in the Town of Sahuarita’s public right-of-way should complete this application and provide the listed project information and attachments.
How to submit it
Submit the completed application and required attachments to the Town of Sahuarita Public Works Department, 375 W Sahuarita Center Way, Sahuarita, AZ 85629, or email [email protected]. The form lists fees, including a $200 base fee.
About notarization
This application does not require a notary; the applicant signs and dates it, and the cost estimate must be signed by the property owner.
How to submit this form
- 1
Download the Application
Download the Town of Sahuarita Right-of-Way Use Application PDF.
- 2
Complete the Application
Enter applicant, contractor, and project information, describe the work, and provide the proposed start and end dates.
- 3
Gather Required Attachments
Include a site location map, cost estimate signed by the property owner, traffic control plans when necessary, and applicable checklist items.
- 4
Submit to Public Works
Submit the completed application and attachments to the Public Works Department by mail or email.
Frequently asked questions
- What is the Sahuarita Right-of-Way Use Application for?
- It requests permission to use the Town of Sahuarita’s public right-of-way for work such as trenching, boring, or traffic control setup.
- What attachments does the application call for?
- The instructions list a site location map, cost estimate, traffic control plans when necessary, and applicable checklist items. The cost estimate must be signed by the property owner.
- Do I need a notary for the Right-of-Way Use Application?
- No. The application does not require notarization; the applicant signs and dates it. The cost estimate must be signed by the property owner.
- How do I submit the Right-of-Way Use Application?
- Send it with the required attachments to the Town of Sahuarita Public Works Department at 375 W Sahuarita Center Way, Sahuarita, AZ 85629, or email [email protected].
Need something notarized?
This Right-of-Way Use Application doesn’t need a notary — but if you have another Sahuarita form that does, a commissioned online notary can help.
