Roof Mounted Photovoltaic Re-Installation Property Owner Acknowledgement

Homeowners complete this acknowledgement for a roofing permit that includes removal of a roof-mounted photovoltaic system.

What this form is

This form records the property owner’s acknowledgement that a separate permit is required before a dismantled photovoltaic system is re-installed. The city says the form must be submitted upon request for a roofing permit that includes removal of the system. It asks for the property address, owner and roofing contractor names, and the owner’s printed name, signature, and date.

Who needs it

A homeowner whose roofing permit includes removal of a roof-mounted photovoltaic system may need to complete this acknowledgement when the city requests it.

How to submit it

The form says to submit it upon request for a roofing permit that includes photovoltaic system removal. It identifies the Development Services Department, Building Division, at 311 Vernon Street, Roseville, California 95678-2649.

About notarization

This acknowledgement is signed and dated without a notary; the form identifies no notarized attachment or sworn step.

How to submit this form

  1. 1

    Download The Form

    Download the Roof Mounted Photovoltaic Re-Installation Property Owner Acknowledgement.

  2. 2

    Complete The Form

    Enter the property address, owner name, and roofing contractor name; print the owner's name, then sign and date.

  3. 3

    Gather Attachments

    The form does not identify any required attachments.

  4. 4

    Submit To The City

    Submit it upon request for a roofing permit that includes removal of the photovoltaic system.

Frequently asked questions

Do I need a notary for the Roof Mounted Photovoltaic Re-Installation Property Owner Acknowledgement?
No. The homeowner signs and dates this acknowledgement without a notary, and the form does not identify a notarized attachment or sworn step.
How do I submit the photovoltaic re-installation acknowledgement?
Submit it upon request for a roofing permit that includes removal of the photovoltaic system. The form lists the Development Services Department, Building Division, at 311 Vernon Street.
When does Roseville require this acknowledgement?
The form says it must be submitted upon request for a roofing permit that includes removal of a photovoltaic system.
What information does the homeowner provide?
The form asks for the property address, owner name, roofing contractor name, and the owner's printed name, signature, and date.

Need something notarized?