Barrow County, GA · Barrow County
Water Capacity Availability Letter Request
Barrow County property owners or representatives use this application to request a water capacity availability determination for a development project.
At a glance
- Issued by
- City of Barrow County · Barrow County, Barrow County, Georgia
- Notarization
- Not required: file this form without a notary.
- Official source
- barrowga.org
- Blank form
- Download the PDF
- Catalogued
- Machine-readable
- JSON record · about the forms index
What this form is
This application requests an evaluation of whether the Barrow County Water System can provide capacity for a proposed commercial, industrial, residential, or subdivision project. Applicants provide project location, proposed use, flow or unit information, and owner and applicant details. Return a concept drawing and fees with the application; commercial, multi-family, or subdivision projects require a fire flow and pressure test before approval.
Who needs it
An owner or the owner's legal representative needs this application to request water capacity certification for a proposed development.
How to submit it
Return the application with a concept drawing and fees. Pay at the Water Resources Office, 59 Lee Street, Winder, GA 30680.
About notarization
This document is signed without a notary; the applicant and owner sign and date it, and no notarized or sworn attachment is specified.
How to submit this form
- 1
Download the Application
Download the Water Capacity Availability Letter Request.
- 2
Complete the Application
Provide the development location, proposed use, requested capacity details, and applicant and owner information.
- 3
Gather the Concept Drawing
Return a concept drawing with the application; commercial, multi-family, or subdivision projects require a fire flow and pressure test before approval.
- 4
Submit to Water Resources
Return the application and concept drawing with fees. Pay at the Water Resources Office, 59 Lee Street, Winder, GA 30680.
Frequently asked questions
- Who uses the Water Capacity Availability Letter Request?
- An owner or the owner's legal representative uses it to request water capacity certification for a proposed commercial, industrial, residential, multi-family, or subdivision project.
- What should I include with the application?
- Return a concept drawing and fees with the application. Commercial, multi-family, or subdivision projects require a fire flow and pressure test before application approval.
- How do I submit the water capacity request?
- Return the application with a concept drawing and fees. The form says to pay at the Water Resources Office, 59 Lee Street, Winder, GA 30680.
- Do I need a notary for the Water Capacity Availability Letter Request?
- No. This document has applicant and owner signature and date fields but no notary block or notarized attachment requirement.
