Winnebago County, IL · Winnebago County

No notary required

Application for Subdivision Plat Review

Winnebago County’s application is for applicants seeking review of a preliminary, tentative, final, or re-plat subdivision and its associated plat materials.

At a glance

Issued by
City of Winnebago County · Winnebago County, Winnebago County, Illinois
Notarization
Not required: file this form without a notary.
Official source
wincoil.gov
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

Use this application to request county review of a preliminary or tentative plat, final plat, or re-plat. It asks for applicant, owner, surveyor or engineer, and project contact details, along with property information, proposed uses, lot counts, sewage disposal, improvements, utilities, and other materials submitted. The form also lists required plat copies and filing fees.

Who needs it

Applicants seeking Winnebago County review of a subdivision plat should complete this application and provide the required plat copies and other materials.

How to submit it

File the application and required plat copies with the Planning & Zoning Office at 404 Elm Street, Room 403, Rockford, Illinois 61101. Filing fees are due with the application.

About notarization

This application is signed and dated by the applicant and surveyor or engineer without a notary; no notarized attachment or related step is specified.

How to submit this form

  1. 1

    Download the Application

    Download the subdivision plat review application PDF.

  2. 2

    Complete the Application

    Provide applicant and project contact details, property information, proposed uses, sewage disposal, improvements, utilities, and other submitted materials.

  3. 3

    Gather Plat Copies

    Prepare twelve full-size folded copies and two 11-by-17-inch copies of each plat page. Include two soil delineation copies for septic-serviced subdivisions.

  4. 4

    Submit to the County

    File the application and required materials with the Planning & Zoning Office, with the applicable filing fee.

Frequently asked questions

Who uses the Application for Subdivision Plat Review?
Applicants seeking review of a preliminary or tentative plat, final plat, or re-plat use this application to provide project and property details.
What materials must I file with the application?
The filing procedure calls for twelve full-size plat copies folded to 8.5 by 11 inches and two 11-by-17-inch copies of each plat page. Septic-serviced subdivisions also require two copies of the soil delineation overlay map or report.
Do I need a notary for the Application for Subdivision Plat Review?
No. The application has signature and date lines for the applicant and surveyor or engineer, but no notary block or notarized attachment is specified.
How do I submit the Application for Subdivision Plat Review?
File it with the Planning & Zoning Office at 404 Elm Street, Room 403, Rockford, Illinois 61101. The form says filing fees are due with the application.

Need something notarized?

This Application for Subdivision Plat Review doesn’t need a notary, but Illinois residents can notarize other documents online with a commissioned online notary.