Joint Application for Proposed Work in Streams, Wetlands, Floodplains, and Other Water Bodies

This joint application is for applicants proposing work in streams, wetlands, floodplains, or other water bodies who need local, state, or federal permits.

At a glance

Issued by
City of Stillwater County · Stillwater County, Stillwater County, Montana
Notarization
Not required: file this form without a notary.
Official source
stillwatercountymt.gov
Blank form
Download the PDF
Catalogued
Machine-readable
JSON record · about the forms index

What this form is

Use this application to seek one or more listed permits for proposed work in or near water bodies. The form asks about the applicant, landowner, contractor, project site, project purpose, construction details, and potential impacts; supporting maps, plans, and other attachments may also be required. Applicants must submit a signed application to each applicable agency, which issues its own separate permit.

Who needs it

Applicants proposing work in or near streams, wetlands, floodplains, or other water bodies who need one or more of the permits listed on the form should complete it.

How to submit it

Send the required number of copies, with original signatures when required, to each applicable agency. The form lists submission instructions and contacts for the participating agencies.

About notarization

This document is signed without a notary; the applicant, landowner, or agent signs and dates the applicable signature line.

How to submit this form

  1. 1

    Download the Application

    Download the joint application and review the instructions to determine which permits may apply to your project.

  2. 2

    Complete the Application

    Fill in the applicant, project site, project purpose, activity, construction details, and applicable permit sections.

  3. 3

    Gather Required Attachments

    Prepare the required maps, plans, drawings, and any other attachments applicable to the permits you are seeking.

  4. 4

    Submit to Each Applicable Agency

    Send the required number of copies, with original signatures when required, to each agency for which you are applying.

Frequently asked questions

Do I need a notary for the joint water work application?
No. This application is signed without a notary; the applicant, landowner, or agent signs and dates the applicable signature line.
How do I submit the joint water work application?
Send the required number of copies, with original signatures when required, to each applicable agency. The form provides agency-specific submission instructions.
What attachments may be needed with this application?
The form calls for plans or drawings and a vicinity map or sketch. Depending on the permits requested, it may also require an annual plan of operation, aquatic resource map, or other supporting information.
Does one application issue all the permits?
No. The joint application can be used to apply to participating agencies, but each agency issues its own separate permit.