Right-of-Way Construction and Maintenance Permit Application

This application requests a Cedar Grove permit for construction or maintenance in a Township right-of-way and is completed by the applicant.

What this form is

Applicants must submit this application before starting construction or maintenance in a Township right-of-way, except in emergencies as described on the form. It asks for applicant and owner contacts, proposed work, location, excavation size, and schedule. The application also lists required plans and supporting materials, fees, insurance, and possible bond or escrow requirements.

Who needs it

Applicants planning construction or maintenance within a Cedar Grove Township right-of-way must submit this application before work begins, except in emergencies.

How to submit it

Submit the initial package to the Engineering Department, 340 Little Falls Road, Cedar Grove, NJ 07009. Include three hard copies and electronic plans or sketches, required fees, and listed supporting items; credit cards are not accepted.

About notarization

This application is signed and dated without a notary; its certification is in lieu of oath, and no notarized attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the right-of-way construction and maintenance permit application.

  2. 2

    Complete And Sign

    Provide applicant and owner contact details, work description and location, excavation information, schedule, and the required signature and date.

  3. 3

    Gather Supporting Items

    Prepare the listed insurance certificate, plans or sketches, required fees, and other applicable supporting materials.

  4. 4

    Submit To The Engineering Department

    Send the initial package to the Engineering Department with three hard copies and electronic plans or sketches.

Frequently asked questions

Do I need a notary for the Right-of-Way Permit Application?
No. The application is signed and dated without a notary; its certification is in lieu of oath, and the form does not identify a notarized attachment.
How do I submit the Right-of-Way Permit Application?
Submit the initial package to the Engineering Department at 340 Little Falls Road, Cedar Grove, NJ 07009. The instructions call for three hard copies and electronic plans or sketches, along with fees and supporting items.
When must I submit this permit application?
The form says to provide the application before construction or maintenance begins in a Township right-of-way, except in emergencies as defined on the form.
What materials must accompany the application?
The initial package includes a completed, signed application with an insurance certificate, three hard copies and electronic plans or sketches, and the application and review fees. Other supporting materials are listed on the form.

Need something notarized?

This Right-of-Way Construction and Maintenance Permit Application doesn’t need a notary — but if you have another Cedar Grove form that does, a commissioned online notary can help.