South River, MT · Middlesex County
Electric Vehicle Charging Station Application
Property owners or agents use this application to request approval for an electric vehicle charging station installation in South River.
What this form is
The application collects property and contractor details, occupancy type, charging equipment information, and electrical service specifications. It is required for Level II charging equipment and for installing a new 120-volt outlet for Level I equipment; Level I equipment using a standard outlet does not require a permit. Applicants must provide the charging unit’s data or specifications, and an inspection is required when installation is complete.
Who needs it
Property owners or agents installing covered electric vehicle charging equipment or a new 120-volt outlet should complete this application.
How to submit it
Submit the completed application to the Borough of South River at 48 Washington Street. The application lists fees of $25 for Level I and $100 for Level II or Level III, payable to the Borough.
About notarization
This application is signed and dated without a notary; the required charging-unit data or specifications are an attachment, and the form does not say they must be notarized.
How to submit this form
- 1
Download The Application
Download the Electric Vehicle Charging Station Application PDF.
- 2
Complete The Application
Provide the property, contractor, charging equipment, and electrical service information requested.
- 3
Gather The Equipment Specifications
Include a copy of the charging unit’s data or specifications.
- 4
Submit To The Borough
Submit the application to the Borough of South River at 48 Washington Street with the applicable listed fee.
Frequently asked questions
- Do I need a notary for the Electric Vehicle Charging Station Application?
- No. The application has a signature and date line but no notary block. It also requires charging-unit data or specifications, which the form does not say must be notarized.
- How do I submit the Electric Vehicle Charging Station Application?
- Submit the completed application to the Borough of South River at 48 Washington Street. Include the charging unit’s data or specifications and the applicable fee listed on the form.
- What information does the application ask for?
- It asks for property owner and contractor contact details, the work location, occupancy type, charging equipment details, and existing or proposed electrical service information.
- When is this application required?
- The form says a permit is required for Level II charging equipment and for installing a new 120-volt outlet for Level I equipment. Level I equipment using a standard house outlet does not require a permit.
Need something notarized?