South River, MT · Middlesex County

No notary required

Roll-Off Dumpster and Container Permit Application

South River property owners or applicants use this application to request a permit for a roll-off dumpster or storage container placed on a street.

What this form is

The application requests a permit for a roll-off dumpster or storage container placed on a street in South River; containers in a homeowner’s driveway do not require a permit unless they protrude from it. It asks for the location, dates, applicant and property owner details, container company and dimensions, and a federal tax identification number. Include a completed W-9; the city says the application requires Police Department review.

Who needs it

Applicants placing a dumpster or storage container on a South River street need this permit application; driveway placement requires one only if the unit protrudes.

How to submit it

Complete the application and W-9, then submit them with two checks payable to the Borough of South River: a $50 application fee and a $200 escrow fee. The form lists the Borough at 48 Washington Street, South River, NJ 08882.

About notarization

This application is signed and dated without a notary; include the W-9 form, and the document states no notarized or sworn step for it.

How to submit this form

  1. 1

    Download The Application

    Download the roll-off dumpster and container permit application.

  2. 2

    Complete The Application

    Fill in the location, drop date, tentative removal date, applicant details, and container information, then sign and date it.

  3. 3

    Gather The W-9 And Checks

    Include a completed W-9 and two checks payable to the Borough of South River: $50 for the application fee and $200 for the escrow fee.

  4. 4

    Submit To The Borough

    Submit the application, W-9, and checks to the Borough of South River at the address listed on the form.

Frequently asked questions

Who needs the South River dumpster permit application?
Applicants placing a dumpster or storage container on a South River street need a permit. A container in a homeowner’s driveway does not need one unless it protrudes from the driveway.
How do I submit the dumpster permit application?
Complete the application and W-9, then submit them with two checks payable to the Borough: $50 for the application fee and $200 for the escrow fee. The form lists the Borough’s address.
Do I need a notary for the dumpster permit application?
No. Sign and date the application without a notary. Include the W-9; the document does not state that it must be notarized or sworn.
How long is the dumpster permit valid?
The document says the permit is good for 30 days. It says each additional 30-day period requires a new permit and a $25 processing fee.

Need something notarized?

This Roll-Off Dumpster and Container Permit Application doesn’t need a notary — but if you have another South River form that does, a commissioned online notary can help.