South River, MT · Middlesex County
Sign Zoning Permit Application
South River business owners or agents use this application to request zoning approval for a proposed sign at a business location.
What this form is
The application requests business and contractor contact details, the sign’s location, property block and lot, sign and facade areas, and whether the sign will be illuminated. South River requires Zoning Department approval for signs. The accompanying guide describes drawing and survey materials to submit and notes that zoning inspections are required for all sign installations.
Who needs it
A business owner or agent seeking zoning approval for a sign in South River should complete the application and provide the listed sign information.
How to submit it
The guide says to obtain and complete the zoning application from the Zoning/Construction Office and submit two sets of sign drawings. The form lists the Department of Zoning at 48 Washington Street.
About notarization
This application is signed without a notary; the form asks the applicant to sign and does not identify any notarized attachment or sworn step.
How to submit this form
- 1
Download The Application
Download the Sign Zoning Permit Application PDF.
- 2
Complete The Application
Enter the owner, contractor, property, and sign details, then sign the application.
- 3
Gather Sign Materials
Prepare two sets of sign drawings and the survey and other materials described in the guide.
- 4
Submit To The Borough
Submit the completed application and drawings to the Department of Zoning at 48 Washington Street.
Frequently asked questions
- Do I need a notary for the Sign Zoning Permit Application?
- No. The application asks the applicant to sign, and it does not identify a notarized attachment or sworn step.
- How do I submit the sign zoning permit application?
- The guide says to complete the zoning application and submit two sets of sign drawings. The form lists the Department of Zoning at 48 Washington Street.
- What information does the application ask for?
- It asks for owner and contractor contact details, the sign location, block and lot, sign and facade areas, and whether the sign will be illuminated.
- What drawings does the sign permit guide describe?
- The guide calls for two sets of drawings, including sign dimensions and colors, the proposed location when applicable, and before-and-after pictures or drawings with building dimensions.
Need something notarized?
This Sign Zoning Permit Application doesn’t need a notary — but if you have another South River form that does, a commissioned online notary can help.
