Property applicants use this application to request the final engineering and zoning compliance inspection required before a certificate is issued.

What this form is

The application requests a final engineering and zoning compliance inspection before the city issues a Certificate of Occupancy, Temporary Certificate of Occupancy, or Certificate of Approval. Applicants provide the property location, completed work type, and contact information, and certify compliance with applicable requirements. The application calls for two copies of a current as-built topographic survey for projects that obtained a Land Disturbance Permit.

Who needs it

Applicants seeking a Certificate of Occupancy, Temporary Certificate of Occupancy, or Certificate of Approval after construction use this application to request final review.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; it includes no separate attachment or related step requiring a notarized or sworn statement.

How to submit this form

  1. 1

    Download The Application

    Download the Request for Zoning Compliance and Final Engineering Review.

  2. 2

    Complete The Application

    Enter the property location, type of work completed, and applicant contact information, then sign and date the certification.

  3. 3

    Gather The Survey

    Prepare a current final as-built topographic survey; provide two copies for projects that obtained a Land Disturbance Permit.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Zoning Compliance and Final Engineering Review request?
No. The application provides a signature and date line, but no notary block or sworn attachment is specified; the applicant signs and dates it.
Who uses this application?
Applicants seeking a Certificate of Occupancy, Temporary Certificate of Occupancy, or Certificate of Approval after construction use it to request final engineering and zoning compliance review.
What survey must accompany the application?
The document requires a current final as-built topographic survey showing post-construction conditions and final grades. Two copies are required for projects that obtained a Land Disturbance Permit.
How do I submit the application?
The document does not provide submission instructions. Submit it to the city department named on the form and check the city website for current contact details.

Need something notarized?

This Request for Zoning Compliance and Final Engineering Review doesn’t need a notary — but if you have another Monmouth Beach form that does, a commissioned online notary can help.