Mount Arlington, MT · Morris County

No notary required

Water/Sewer Connection Application

Property owners complete this application to provide information used to size a water service connection for a habitable structure in Mount Arlington.

What this form is

The Water/Sewer Connection Application provides information to help the borough size a water service connection to a property. An individual questionnaire is required for each habitable structure that will receive water service; applicants provide the structure’s address, building details, bedrooms, and plumbing fixture quantities. The borough completes the connection sizing, fee, and permit sections.

Who needs it

Property owners seeking water service for a habitable structure complete a separate questionnaire for each structure on the lot.

How to submit it

Return the questionnaire to the Technical Assistant to the Construction Official, Construction Office, 419 Howard Blvd., Mount Arlington, NJ 07856.

About notarization

This application is signed and dated without a notary; the document mentions no notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download The Application

    Download the Water/Sewer Connection Application PDF.

  2. 2

    Complete Part I

    Complete Items 1 through 9 in Part I, including property, building, bedroom, and plumbing fixture information.

  3. 3

    Prepare A Questionnaire For Each Structure

    Fill out a separate questionnaire for each habitable structure on the lot that will receive water service.

  4. 4

    Sign And Date

    Print your name, sign the application, and enter the date.

  5. 5

    Return The Questionnaire

    Send it to the Technical Assistant to the Construction Official, Construction Office, 419 Howard Blvd., Mount Arlington, NJ 07856.

Frequently asked questions

Do I need a notary for the Water/Sewer Connection Application?
No. The application has an applicant signature and date, but no notary block. The document mentions no notarized or sworn attachment or related step.
How do I submit the Water/Sewer Connection Application?
Return the questionnaire to the Technical Assistant to the Construction Official, Construction Office, 419 Howard Blvd., Mount Arlington, NJ 07856.
Who completes the Water/Sewer Connection Application?
The applicant completes Part I. The borough completes the equivalent dwelling unit, fee, and computation details, and the Building Department completes permit information.
Do I need a separate questionnaire for each structure?
Yes. The application information says to fill out an individual questionnaire for each habitable structure that will receive water service.

Need something notarized?

This Water/Sewer Connection Application doesn’t need a notary — but if you have another Mount Arlington form that does, a commissioned online notary can help.