Goshen, NY · Orange County

Building Permit Application

The Town of Goshen Building & Zoning Department uses this application to review proposed construction, alterations, additions, repairs, removals, or demolition and issue a building permit.

Detailed form~25 min to notarize
  • licensed online notary
  • ~15 min average
  • Notarized PDF emailed

What you’ll need

  • Government-issued photo ID
  • Webcam-enabled device (laptop or phone)
  • This form, ready to upload as a PDF

What this form is

Applicants provide property, owner, project, contractor, insurance, and construction details, and draw a plot diagram showing buildings, lot lines, and setbacks. The application instructions require a complete submission with two sets of plans and specifications; work may not begin until the Building Department issues a permit. A notice about truss-type, pre-engineered wood, or timber construction is included for applicable residential projects.

Who needs it

An owner or authorized applicant proposing construction, an addition, alteration, repair, removal, demolition, pool, sign, deck, shed, or garage in the Town of Goshen needs this application.

Why it needs a notary

The applicant named in the sworn statement signs before a notary public, who completes the jurat marked “Sworn to before me”; the separate construction notice has signature fields.

How to get this notarized

  1. 1

    Download The Application

    Get the Town of Goshen Building Permit Application and review its instructions and required supporting materials.

  2. 2

    Fill Out The Form

    Complete the project and property fields, prepare the plot diagram, and gather the plans and specifications.

  3. 3

    Book An Online Notary

    Arrange a video appointment with a commissioned online notary for the applicant's sworn statement.

  4. 4

    Sign On Video

    Sign the sworn statement when instructed during the online notarization session.

  5. 5

    Submit To The Town

    Submit the completed application and required materials to the Town of Goshen Building & Zoning Department.

Preview the form

The blank PDF straight from Goshen. Look it over, then upload your filled copy to start the notary session.

Open in new tab
Info

You’ll need ID and a webcam.

A licensed online notary will join you on video, verify your government-issued ID, witness your signature, and apply their seal. You’ll receive the notarized PDF by email when the session ends.

Frequently asked questions

How do I complete the notarized section?
Fill out the application and sworn statement, but wait to sign the statement until you are with a commissioned online notary. The notary completes the jurat after you swear to the statement.
Do I need to submit plans with this application?
The form instructions call for a plot plan and two complete sets of plans and specifications describing the proposed work. Check with the Town Building & Zoning Department about your project submission.
Can I sign this application with an online notary?
New York authorizes remote online notarization by its notaries under Executive Law §135-c, effective in 2023. You can sign during a video session with a commissioned online notary; confirm with the city, town or village if unsure.
When can construction begin?
The application instructions state that work covered by the application may not begin before the Building Department issues a building permit.

Building Permit Application in other Orange County cities

Each city publishes its own version of this form. Pick the city where you’re filing.

Ready to notarize your Building Permit Application?

Drop your email below — we’ll hand you straight to a licensed notary in the next session.