Greenwood Lake, NY · Orange County

Building Permit Application

This application requests a Village of Greenwood Lake building permit and is filed by an owner or contractor proposing construction, renovation, or other work requiring village review.

Standard form~15 min to notarize
  • licensed online notary
  • ~15 min average
  • Notarized PDF emailed

What you’ll need

  • Government-issued photo ID
  • Webcam-enabled device (laptop or phone)
  • This form, ready to upload as a PDF

What this form is

The application provides site, project, owner, contractor, and design professional information for the Village of Greenwood Lake Building Department to review a proposed job. The form asks applicants to submit the completed application and fee with applicable insurance certificates and supporting plans or survey materials; requirements vary by project type and estimated cost. The village states that incomplete applications will not be accepted and that permitted work must be inspected and the permit closed out.

Who needs it

An owner or contractor proposing work covered by this application should complete it and submit it with the project materials required by the village.

Why it needs a notary

The form includes a sworn-to-before-me jurat; the owner or contractor named in the authorization signs and swears to the application before a notary.

How to get this notarized

  1. 1

    Download the Application

    Get the Village of Greenwood Lake building permit application and review its submission checklist.

  2. 2

    Fill Out the Form

    Enter the site, project, owner, contractor, and design professional details that apply to your job.

  3. 3

    Book an Online Notary

    Schedule a session with a commissioned online notary for the sworn authorization.

  4. 4

    Sign on Video

    Appear by video, sign the authorization, and swear to its statements before the notary.

  5. 5

    Submit to the Village

    Submit the notarized application, fee, and applicable supporting documents to the Village of Greenwood Lake Building Department.

Preview the form

The blank PDF straight from Greenwood Lake. Look it over, then upload your filled copy to start the notary session.

Open in new tab
Info

You’ll need ID and a webcam.

A licensed online notary will join you on video, verify your government-issued ID, witness your signature, and apply their seal. You’ll receive the notarized PDF by email when the session ends.

Frequently asked questions

How do I get the building permit application notarized online?
Complete the application, then book a session with a commissioned online notary. Sign and swear to the authorization during the video session, then submit the application and required project materials to the village.
Do I need to sign the application in front of a notary?
Yes. The authorization includes a sworn-to-before-me jurat, so the owner or contractor signing it must appear before a notary and swear that the statements are true to the best of their knowledge and belief.
What supporting documents does the village require?
The form lists insurance certificates for all permits and additional materials based on the project, such as plans or a survey. It says incomplete applications will not be accepted; confirm with the city, town or village if unsure.
Can I use online notarization for this New York form?
New York authorizes its own notaries to perform remote online notarization under Executive Law §135-c, in effect since 2023. Rush Notary can connect you with a commissioned online notary for the sworn signing.

Building Permit Application in other Orange County cities

Each city publishes its own version of this form. Pick the city where you’re filing.

Ready to notarize your Building Permit Application?

Drop your email below — we’ll hand you straight to a licensed notary in the next session.