West Hampton Dunes, NY · Suffolk County

No notary required

Solar Energy System Fast Track Permit Application

Property owners and solar installation contractors use this application and checklist to request fast-track permits for grid-tied photovoltaic or residential solar hot water systems.

What this form is

This application is for proposed grid-tied photovoltaic or residential solar hot water systems that meet the checklist criteria. Before permit approval and issuance, applicants must submit the checklist, three sets of plans, and the application information sheet. The form asks about the property, system, contractor, roofing material, and equipment, and requires signatures from the property owner and solar installation contractor.

Who needs it

Property owners and solar installation contractors seeking fast-track permits for qualifying grid-tied photovoltaic or residential solar hot water systems need this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the property owner and solar installation contractor sign and date the checklist and information sheet.

How to submit this form

  1. 1

    Download The Application

    Download the Solar Energy System Fast Track Permit Application and review its checklist and submittal requirements.

  2. 2

    Complete The Forms

    Provide the property, system, contractor, roofing, and equipment details, then have the property owner and contractor sign and date the forms.

  3. 3

    Gather Required Materials

    Include the checklist, three sets of plans, and the application information sheet; provide other listed materials, such as a survey when applicable.

  4. 4

    Submit To The City

    Submit the materials to the city department named on the form and check the city website for current contact details.

Frequently asked questions

What does the Solar Energy System Fast Track Permit Application cover?
It covers proposed grid-tied photovoltaic or residential solar hot water systems that meet the listed checklist criteria, and requests property, system, contractor, and equipment information.
Who needs to complete this solar permit application?
Property owners and solar installation contractors seeking fast-track permits for qualifying grid-tied photovoltaic or residential solar hot water systems use the application and sign its checklist and information sheet.
Do I need a notary for the Solar Energy System Fast Track Permit Application?
No. This document is signed and dated without a notary; the property owner and solar installation contractor sign and date the checklist and information sheet.
How do I submit the Solar Energy System Fast Track Permit Application?
Submit it to the city department named on the form; check the city website for current contact details. The application requires a checklist, three sets of plans, and an information sheet.

Need something notarized?

This Solar Energy System Fast Track Permit Application doesn’t need a notary — but if you have another West Hampton Dunes form that does, a commissioned online notary can help.