Fayetteville, NC · Cumberland County

No notary required

Manufactured or Modular Building Placement Application

This application requests a permit to place a manufactured or modular building in Fayetteville and is filed by an eligible contractor or owner.

What this form is

Use this application to request a permit for a manufactured or modular building placement. Only an NC-licensed set-up contractor, NC general contractor, or owner may apply, and commercial projects need approved plan review before a permit is issued. The form asks for project and property details, contractor information, and a signed certification; the permit covers specified building placement work, while other trades require separate applications.

Who needs it

An NC-licensed set-up contractor, NC general contractor, or owner applying for a manufactured or modular building placement permit needs this application.

How to submit it

This application is for the E-Development Portal only. After the plans or application are approved in the portal, use its post-approval upload function to upload the permit application.

About notarization

This application is signed and dated without a notary; it requires no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Manufactured or Modular Building Placement Application PDF.

  2. 2

    Complete The Application

    Enter the property, project, and contractor details, then sign and date the certification.

  3. 3

    Get Plans Approved

    Submit the plans or application through the E-Development Portal; commercial projects need approved plan review before a permit is issued.

  4. 4

    Upload The Permit Application

    After approval in the portal, use the post-approval upload function to upload the permit application.

Frequently asked questions

Who can apply for a manufactured or modular building placement permit?
The application says only an NC-licensed set-up contractor, NC general contractor, or owner can apply for this permit.
How do I submit the Manufactured or Modular Building Placement Application?
Use the E-Development Portal. After your plans or application are approved there, use the post-approval upload function to upload the permit application.
Do I need a notary for the Manufactured or Modular Building Placement Application?
No. The application has a signature and date line but no notary block, and it identifies no notarized or sworn attachment.
What work does this permit cover?
The application says the permit covers the building foundation or tie-downs, applicable marriage connections, and stairs or landing no greater than 10 square feet. Other listed trades need separate permit applications.

Need something notarized?

This Manufactured or Modular Building Placement Application doesn’t need a notary — but if you have another Fayetteville form that does, a commissioned online notary can help.