Butner, NC · Granville County
Stormwater Management Permit Application and Checklist
This application and checklist helps property owners and developers submit stormwater permit materials for development or redevelopment in Butner.
What this form is
The application collects project and site details, design professional and owner information, and stormwater calculations and plan materials. Non-exempt projects must complete Sections 1–4; additional sections apply when a stormwater control measure or partial offsite nutrient control is proposed. The checklist identifies supporting documents and approvals required before construction permits and final stormwater approval.
Who needs it
Owners and developers of non-exempt projects in Butner submit the application and applicable materials for stormwater permit review.
How to submit it
Contact the local Planning Department to confirm the stormwater review fee payment process, if any. Submit one hardcopy to the local planning department and stormwater review engineer Kelway Howard, PE, at the address listed on the form.
About notarization
The application is signed without a notary; however, a signed and notarized Operation and Maintenance Manual is required before plan approval when a stormwater control measure is required.
How to submit this form
- 1
Download The Application
Download the Stormwater Management Permit Application and Checklist.
- 2
Complete Applicable Sections
Fill in Sections 1–4 for a non-exempt project and complete other sections that apply to your project.
- 3
Gather Required Materials
Use the checklist to gather applicable calculations, plans, manuals, permits, and other supporting documents.
- 4
Submit A Hardcopy
Submit one hardcopy to the local planning department and the stormwater review engineer listed on the form.
Frequently asked questions
- Do I need a notary for the Stormwater Management Permit Application?
- No. The application is signed without a notary. If a stormwater control measure is required, a signed and notarized Operation and Maintenance Manual is required before plan approval.
- How do I submit the Stormwater Management Permit Application?
- Submit one hardcopy to the local planning department and the stormwater review engineer at the address listed on the form. Contact the local Planning Department about the fee payment process, if any.
- Which sections of the application must I complete?
- The form says all non-exempt projects must complete Sections 1–4. Complete Section 5 if a stormwater control measure is required and Section 6 if partial offsite nutrient control is proposed.
- What supporting materials may be required?
- Depending on the project, materials may include nutrient and peak-flow calculations, a stormwater management plan, an operation and maintenance manual, permits, and recorded agreements.