Louisville, OH · Stark County
Site Plan Checklist
This checklist helps applicants confirm that a site plan package includes the required information and materials before submitting it to Louisville for review.
What this form is
Louisville requires this checklist with all site plans submitted for review and processing; incomplete packages will not be processed. Applicants use it to verify that the site plan includes applicable project, property, natural-feature, and proposed-development details. The listed complete replat package also includes a Planning Commission Application, plan copies, a reduced copy, and an electronic PDF set.
Who needs it
Applicants submitting a site plan package to Louisville must complete the checklist and mark any inapplicable requirements as N/A.
How to submit it
The Engineering and Planning Departments review the site plan, and comments are sent by email and mail. Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This checklist is signed and dated without a notary; no notarized or sworn attachment or related step is identified.
How to submit this form
- 1
Download The Checklist
Download the Site Plan Checklist PDF for a Louisville site plan submission.
- 2
Complete The Checklist
Check each applicable requirement and write N/A beside items that do not apply. Sign and date the attestation.
- 3
Gather The Package Materials
Include the listed Planning Commission Application, plan copies, reduced copy, and electronic PDF set for a complete replat package.
- 4
Submit The Package
Submit the package to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- Who uses the Louisville Site Plan Checklist?
- Applicants submitting site plans for review and processing use this checklist to confirm that the package includes all applicable requirements. Incomplete submissions will not be processed.
- What materials are listed in the complete replat package?
- The checklist names the Site Plan Checklist, a Planning Commission Application, four copies of the site plan, a reduced 8½-by-11-inch copy, and an electronic PDF set of plans.
- Do I need a notary for the Site Plan Checklist?
- No. The checklist has an applicant signature and date line, but no notary block. The document does not identify a notarized or sworn attachment or related step.
- How do I submit the Site Plan Checklist?
- The form says the Engineering and Planning Departments review the site plan and send comments by email and mail. Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Site Plan Checklist doesn’t need a notary — but if you have another Louisville form that does, a commissioned online notary can help.
