Montpelier, OH · Williams County

No notary required

Residential Electric Permit

This permit application is for property owners or electrical contractors arranging a new residential electric service or changing an existing service in Montpelier.

What this form is

Montpelier requires a Wiring Permit for all new residential electric service installations and changes to an existing electrical service. The form asks for the property and owner addresses, date, electrical contractor and phone number, service size and location, and additional information; it also lists permit and service costs. The owner or contractor must hold a pre-construction meeting with the Electric Superintendent or an authorized representative to determine the installation location and method.

Who needs it

Property owners or electrical contractors planning a new residential electric service or a change to an existing service need this permit.

How to submit it

Call the Electric Department at 419-485-5576 to schedule the required pre-construction meeting. The form lists Village of Montpelier, 211 N. Jonesville Street, PO Box 148, Montpelier, OH 43543, and says checks should be payable to the Village.

About notarization

This document is signed without a notary; the customer or contractor signs and dates it, and no notarized or sworn attachment is specified.

How to submit this form

  1. 1

    Download The Permit

    Download the Residential Electric Permit form.

  2. 2

    Complete The Form

    Enter the address, date, owner and contractor details, service size and location, and any additional information.

  3. 3

    Schedule The Meeting

    Call the Electric Department at 419-485-5576 to schedule the required pre-construction meeting.

  4. 4

    Submit To The Village

    Use the Village contact information on the form and make checks payable to the Village of Montpelier.

Frequently asked questions

Do I need a notary for the Residential Electric Permit?
No. The document has no notary block; the customer or contractor signs and dates it, and it does not specify a notarized or sworn attachment.
Who needs the Montpelier Residential Electric Permit?
Property owners or electrical contractors need a Wiring Permit for new residential electric service installations and changes to an existing electrical service.
How do I submit the Residential Electric Permit?
Call the Electric Department at 419-485-5576 to schedule the required pre-construction meeting. The form lists the Village address and says checks are payable to the Village.
What information does the permit form request?
It asks for the property and owner addresses, date, contractor and phone number, service size and location, and additional information. It also lists permit and service costs.

Need something notarized?

This Residential Electric Permit doesn’t need a notary — but if you have another Montpelier form that does, a commissioned online notary can help.