This application is for applicants proposing grading, excavation, demolition, or fill work in Conshohocken’s floodplain area.
What this form is
Applicants use this form to request a permit for proposed grading, excavation, demolition, or fill work and provide project and flood elevation information. The application requires two copies and a site plan with specified flood limit, elevation, and fill details. Work must not start until a permit is issued; a separate Floodplain Development Permit is required for construction of structures in or adjacent to a floodplain.
Who needs it
Applicants proposing grading, excavation, demolition, or fill work in Conshohocken’s floodplain area should complete this application.
How to submit it
Provide two copies with the required site plan and copies of any other required permits. Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This application has no notary block; the applicant signs and dates it, and the text calls for a site plan and copies of other required permits, not notarization.
How to submit this form
- 1
Download The Application
Download the Floodplain Grading, Excavation, and Demolition Permit Application.
- 2
Complete The Applicant Sections
Enter the project location, proposed work, developer information, estimated cost, and flood elevation details.
- 3
Gather Required Attachments
Include a site plan showing the required flood limit and elevation details, plus copies of any other required permits.
- 4
Submit Two Copies
Provide two copies and submit them to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What work does this application cover?
- It covers proposed grading, excavation, demolition, and fill work. The form also requests project location, work description, developer information, estimated cost, and flood elevation details.
- Do I need a notary for the Floodplain Grading, Excavation, and Demolition Permit Application?
- No. The application has no notary block; the applicant signs and dates it. The form calls for a site plan and copies of any other required permits.
- How do I submit the floodplain permit application?
- Provide two copies of the application and the required site plan. Submit it to the city department named on the form; check the city website for current contact details.
- Can I start work before the permit is issued?
- No. The application states that work must not start until a permit is issued.
Need something notarized?