Greenville, TX · Hunt County

No notary required

Right of Way Construction Permit Application

Use this application to request a City of Greenville permit for utility or other construction work in the right of way.

What this form is

The application collects the utility owner, contractor, project manager, location, construction limits, work description, and planned dates. It also asks whether pavement or sidewalk cuts and boring are required, and sets out conditions for the work. The form says the city should be notified at least 48 hours before excavation or repairs begin.

Who needs it

Utility owners or contractors planning construction or excavation in the City of Greenville right of way need this application.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the authorized representative agrees to the permit conditions, and no sworn or notarized attachment is mentioned.

How to submit this form

  1. 1

    Download The Application

    Download the City of Greenville Right of Way Construction Permit Application.

  2. 2

    Complete The Application

    Provide the owner, contractor, project, location, construction limits, work description, and planned dates.

  3. 3

    Gather Attachments

    Attach a sketch or drawings if applicable to show the narrowly defined construction limits.

  4. 4

    Submit To The City

    Submit it to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Right of Way Construction Permit Application ask for?
It asks for owner, contractor, project, and work details, including construction limits, planned dates, and whether pavement or sidewalk cuts or boring are required.
Who uses this Greenville right of way application?
Utility owners or contractors planning construction or excavation in the City of Greenville right of way can use the application.
Do I need a notary for the Right of Way Construction Permit Application?
No. The application has an authorized representative's signature and date fields, but no notary block; no sworn or notarized attachment is mentioned.
How do I submit the Right of Way Construction Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.