Huntsville, TX · Walker County

No notary required

Demolition of a Building Application

Owners, agents, or contractors use this application to request a Huntsville permit before demolishing a building or part of a structure.

What this form is

Huntsville requires a demolition permit before a structure is demolished in whole or in part, unless the demolition is covered by a building permit for new construction or renovations. The application asks for the project address and applicant, owner or agent, and contractor information, along with asbestos survey status and signatures. Submit it with a site or building plan and the permit fee.

Who needs it

An owner, owner’s agent, or contractor seeking to demolish a Huntsville structure needs to submit this application before demolition.

How to submit it

Submit the application, a site or building plan showing existing structures and those to be removed, and the permit fee to the Permit Office at 448 SH 75 N, Huntsville, TX 77320.

About notarization

This application is signed and dated without a notary; the document mentions no notarized or sworn attachment or related step.

How to submit this form

  1. 1

    Download the Application

    Download the Demolition of a Building Application PDF.

  2. 2

    Complete the Application

    Provide the project location and applicant, owner or agent, and contractor information; indicate asbestos survey status and sign and date.

  3. 3

    Gather Required Documents

    Include a site or building plan showing existing structures and those to be removed, along with the permit fee.

  4. 4

    Submit to the Permit Office

    Submit the application and required items to the Permit Office at 448 SH 75 N, Huntsville, TX 77320.

Frequently asked questions

Do I need a notary for the Demolition of a Building Application?
No. The application has signature and date fields but no notary block; it mentions no notarized or sworn attachment or related step.
How do I submit the Demolition of a Building Application?
Submit the application, a site or building plan showing existing structures and those to be removed, and the permit fee to the Permit Office at 448 SH 75 N, Huntsville, TX 77320.
When is a demolition permit required in Huntsville?
The application says a permit is required before demolishing any structure in whole or in part, unless the demolition is covered by a building permit for new construction or renovations.

Need something notarized?

This Demolition of a Building Application doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.