Wichita Falls, TX · Wichita County

No notary required

Final Plat Application and Submittal Checklist

This application and checklist helps property owners and their representatives submit a final plat for review by Wichita Falls.

What this form is

Use this application to request review of a final plat and check the plat, engineering plans, and supporting materials against the city’s listed submission requirements. The form asks for project and property details, zoning, subdivision information, and contact information for the owner, applicant, and civil engineer or surveyor. A property owner’s signature is required, and the Planning Department certifies the application complete after reviewing the required submissions.

Who needs it

Property owners submitting a final plat, and the engineers, surveyors, or applicants working with them, use this application and checklist.

How to submit it

Submit the application and required materials to the Planning Division at 1300 7th Street, Wichita Falls, TX 76301. The document lists a plat application fee and an attached plat fee schedule.

About notarization

This document is signed without a notary; the property owner and other listed signers sign and date it, and no notarized attachment or sworn step is specified.

How to submit this form

  1. 1

    Download The Application

    Download the Final Plat Application and Submittal Checklist PDF.

  2. 2

    Complete The Application

    Enter project, property, zoning, subdivision, owner, applicant, and engineer or surveyor information, then sign and date the applicable lines.

  3. 3

    Gather Required Materials

    Use the checklist to gather plat copies and digital files, engineering plans, recorded documents, and other materials applicable to the project.

  4. 4

    Submit To The City

    Submit the application and required materials to the Planning Division at the address listed in the document, with the plat application fee.

Frequently asked questions

What is the Final Plat Application and Submittal Checklist?
It is a city application and checklist for final plat review. It collects project and contact details and lists plat, engineering, and supporting materials for submittal.
Who signs the final plat application?
The document says the property owner’s signature is required for submittal. It also provides signature and date lines for a client, if different from the owner, and the engineer or surveyor.
Do I need a notary for the Final Plat Application and Submittal Checklist?
No. This document is signed without a notary; the listed signers sign and date it, and it does not specify a notarized attachment or sworn step.
How do I submit the Final Plat Application?
Submit the application and required materials to the Planning Division at 1300 7th Street, Wichita Falls, TX 76301. The document lists a plat application fee and an attached fee schedule.

Need something notarized?

This Final Plat Application and Submittal Checklist doesn’t need a notary — but Texas residents can notarize other documents online with a commissioned online notary.