Republic, WA · Ferry County

No notary required

Building Permit Application

Property owners and contractors use this application to request a building permit from the City of Republic for construction or structural remodels.

What this form is

The City of Republic uses this application for new construction and remodels affecting structural components. It asks about the property, proposed work, utilities, water supply, contractor, and site conditions, and includes a critical areas checklist and plot plan. The instructions say to turn in the completed application with a plat map and design drawings; a permit is not issued until questions are answered and requirements are met.

Who needs it

Property owners or contractors planning new construction or a remodel affecting structural components in the City of Republic should complete this application.

How to submit it

Turn in the completed application, plat map, and design drawings. The instructions say the City Clerk generates an invoice, which must be paid before a work permit is issued.

About notarization

This application is signed and dated without a notary; it requests no notarized or sworn attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the City of Republic Building Permit Application PDF.

  2. 2

    Complete The Application

    Answer the application questions and complete the critical areas checklist and plot plan as applicable.

  3. 3

    Gather Required Attachments

    Prepare a plat map and design drawings to submit with the completed application.

  4. 4

    Submit To The City

    Turn in the application and attachments. The City Clerk generates an invoice; the instructions say payment is required before a work permit is issued.

Frequently asked questions

Do I need a notary for the Building Permit Application?
No. This application is signed and dated without a notary, and it does not request a notarized or sworn attachment.
Who should file this building permit application?
Property owners or contractors planning new construction or a remodel that affects structural components should complete the application.
What attachments are required with the application?
The instructions say to turn in a completed application, a plat map, and design drawings. An accurate plot plan must also be submitted before a permit can be issued.
How do I submit the Building Permit Application?
Turn in the completed application, plat map, and design drawings. The City Clerk generates an invoice; the instructions say it must be paid before a work permit is issued.

Need something notarized?

This Building Permit Application doesn’t need a notary — but if you have another Republic form that does, a commissioned online notary can help.