Ephrata, WA · Grant County

No notary required

Demolition Permit Application

Ephrata property owners or contractors use this no-fee application to request a permit for demolishing a structure.

What this form is

The application requests site and owner details, contractor information, and project details for a proposed demolition. The form says two copies of a site plan are required, water and sewer service must be discontinued through Utility Billing, and site photographs are required. It also describes inspection conditions and notes that separate permits or approvals may be required.

Who needs it

Property owners or contractors planning a demolition in Ephrata should complete this application and address the listed submittal requirements.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; the document lists no sworn or notarized attachment, so the signer just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete The Application

    Provide the site, owner, contractor, and project information requested on the form.

  3. 3

    Gather Required Items

    Prepare two copies of the site plan and pictures of the site before demolition; contact Utility Billing about discontinuing water and sewer service.

  4. 4

    Submit To The City

    Submit the application to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application has a signature and date line, but no notary block. The document lists no sworn or notarized attachment, so the signer just signs and dates it.
How do I submit the Demolition Permit Application?
Submit it to the city department named on the form; check the city website for current contact details. The document does not specify a submission method.
What must I provide with the demolition application?
The notice calls for two copies of a site plan on 8½-by-11-inch sheets and pictures of the site before demolition. It also says to contact Utility Billing to discontinue water and sewer service.
Is there a fee for this demolition permit?
The application labels this a “NO FEE PERMIT.” It also says separate permits and approvals may be required for the project.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but if you have another Ephrata form that does, a commissioned online notary can help.