Ephrata, WA · Grant County

No notary required

Demolition Permit Application

This application requests an Ephrata demolition permit and is completed by a property owner or authorized agent, with contractor information included when applicable.

What this form is

Use this application to request a permit to demolish a structure in Ephrata; the document states that demolition permits help ensure the site is left safe and sanitary and the structure is removed from the Assessor’s property tax rolls. It asks for site, owner, contractor, and project details, plus a signature and date. The application also lists required site-plan copies and other items to address before acceptance.

Who needs it

A property owner or authorized agent seeking an Ephrata demolition permit should complete the application and provide the listed site-plan copies and other required items.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application does not require a notary; the owner or authorized agent signs and dates it.

How to submit this form

  1. 1

    Download the Application

    Download the Demolition Permit Application PDF.

  2. 2

    Complete the Application

    Fill in the site, owner, contractor, and project information, then sign and date the application.

  3. 3

    Gather Required Items

    Provide two copies of the site plan and address the notices and items listed on the application.

  4. 4

    Submit to the City

    Submit the application and required items to the city department named on the form; check the city website for current contact details.

Frequently asked questions

Do I need a notary for the Demolition Permit Application?
No. The application has a signature and date line for the owner or authorized agent, but no notary block or notarized attachment is indicated.
How do I submit the Demolition Permit Application?
The document does not specify a submission method or destination. Submit it to the city department named on the form; check the city website for current contact details.
What should I provide with the demolition application?
The notice says to provide two copies of an 8½-by-11-inch site plan showing the listed site details. It also identifies utility, curb or sidewalk, asbestos-survey, and site-photo items to address.

Need something notarized?

This Demolition Permit Application doesn’t need a notary — but if you have another Ephrata form that does, a commissioned online notary can help.