Coupeville, WA · Island County

No notary required

Right of Way Application

Coupeville applicants use this application to request approval for construction or other work in a Town right-of-way or easement.

What this form is

The application is required for work in a Town right-of-way or easement involving activities such as digging, paving, excavation, or depositing material. It asks for applicant and contractor details, the work location and purpose, a description of the proposed work, and its anticipated schedule. Applicants are asked to attach a drawing showing the extent of the work; the form also lists permit and inspection fees.

Who needs it

Anyone proposing work in a Town right-of-way or easement involving installation, paving, digging, excavation, or depositing material needs to apply.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; attach the requested work drawing, which the form does not say must be notarized.

How to submit this form

  1. 1

    Download the Application

    Download the Right of Way Application PDF.

  2. 2

    Complete the Application

    Provide applicant and contractor information, the work location and purpose, and the anticipated starting date and duration.

  3. 3

    Attach a Work Drawing

    Include a drawing that clearly shows the extent of the proposed work.

  4. 4

    Sign and Submit

    Sign and date the application, then submit it to the city department named on the form.

Frequently asked questions

Do I need a notary for the Right of Way Application?
No. The application calls for the applicant’s signature and date, not a notary. It asks for a drawing of the proposed work, but does not say the drawing must be notarized.
How do I submit the Right of Way Application?
Submit it to the city department named on the form; check the city website for current contact details. The form does not provide a submission address, email, or portal.
What should I attach to the application?
Attach a drawing that clearly shows the extent of the proposed work. The form also asks for details about the applicant, work location, contractor, purpose, and anticipated schedule.
When is this application required?
The form says it is required for work within a Town right-of-way or easement involving installation, paving, digging, cutting, excavation, tunneling, breaking up, or depositing material.

Need something notarized?

This Right of Way Application doesn’t need a notary — but if you have another Coupeville form that does, a commissioned online notary can help.