Port Townsend, WA · Jefferson County

No notary required

Binding Site Plan Application Submittal Requirements Checklist

This checklist helps Port Townsend applicants identify the documents and plan details to provide with a binding site plan application.

What this form is

Use this checklist to assemble materials for a binding site plan application in Port Townsend. It lists items such as the property deed, surveys, applicable permits and reports, stormwater information, and a binding site plan map prepared by a licensed land surveyor. Additional requirements depend on the project, including separate materials for residential condominiums and commercial, mixed-use, or industrial proposals.

Who needs it

Applicants proposing a binding site plan in Port Townsend should use this checklist to identify required submittal materials for their project.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This checklist is signed without a notary; residential condominium proposals require a sworn declaration from a registered land surveyor licensed in Washington State.

How to submit this form

  1. 1

    Download The Checklist

    Download the Binding Site Plan Application Submittal Requirements Checklist.

  2. 2

    Review The Requirements

    Check the list and identify which materials apply to your project.

  3. 3

    Gather Supporting Materials

    Assemble applicable deeds, surveys, permits, reports, plans, and map details listed in the checklist.

  4. 4

    Submit To The City

    Submit the materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the binding site plan checklist cover?
It lists application submittal items, including deeds, surveys, applicable permits and reports, stormwater plans, and details required on the binding site plan map.
Who uses this checklist?
Applicants proposing a binding site plan in Port Townsend use it to review the materials required for their project, including any project-specific items listed.
Do I need a notary for the Binding Site Plan Application Submittal Requirements Checklist?
No. The checklist itself is signed without a notary. For residential condominium proposals, the checklist calls for a sworn declaration from a registered land surveyor licensed in Washington State.
How do I submit the binding site plan checklist?
The document does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Binding Site Plan Application Submittal Requirements Checklist doesn’t need a notary — but if you have another Port Townsend form that does, a commissioned online notary can help.