Port Townsend, WA · Jefferson County

No notary required

Historic Design Review Checklist

This checklist outlines the site and design materials applicants submit for Port Townsend Historic Preservation Committee administrative design review.

What this form is

The checklist lists basic submittal requirements for a proposed project seeking Historic Preservation Committee administrative design review. It calls for a site plan and design plans, including dimensioned floor plans, actual color chips, and exterior elevations showing the proposed addition or change. Applicants are advised to consult Planning and Community Development staff about administrative approval and wait for applicable city permits before starting work.

Who needs it

Applicants seeking administrative Historic Preservation Committee design review for a proposed project in Port Townsend need this checklist.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This checklist does not require notarization; it lists no sworn attachment or related notarized step.

How to submit this form

  1. 1

    Download The Checklist

    Download the Historic Design Review Checklist for your proposed project.

  2. 2

    Prepare The Design Materials

    Prepare a site plan and design plans with dimensioned floor plans, actual color chips, and exterior elevations showing the proposed addition or change.

  3. 3

    Check With Planning Staff

    Consult Planning and Community Development staff to see whether your project can be administratively approved.

  4. 4

    Submit To The City

    Submit the checklist and materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What materials does the Historic Design Review Checklist list?
It lists a site plan showing the proposed project location and design plans, including dimensioned floor plans, actual color chips, and exterior elevations showing the proposed addition or change.
Do I need a notary for the Historic Design Review Checklist?
No. The checklist does not require notarization and lists no sworn attachment or related notarized step.
How do I submit the Historic Design Review Checklist?
Submit it to the city department named on the form; check the city website for current contact details.
Should I start my project after submitting the checklist?
The checklist says not to begin until other city permits that may apply, such as building or sign permits, have been issued.

Need something notarized?

This Historic Design Review Checklist doesn’t need a notary — but if you have another Port Townsend form that does, a commissioned online notary can help.