Port Townsend, WA · Jefferson County

No notary required

Lot Line Adjustment Checklist and Signature Page

Property owners or their authorized representatives use this checklist and signature page to submit an initial lot line adjustment application to Port Townsend.

What this form is

This checklist covers the initial step of Port Townsend’s two-step lot line adjustment process and identifies the application materials to provide. It asks for owner or authorized-representative certifications and signatures, and lists drawings, property records, and other materials that may be required, including items specific to Type II applications or certain site conditions. After approval, final documents must be submitted for review and approval within 90 days.

Who needs it

Property owners or authorized representatives seeking a lot line adjustment in Port Townsend use this checklist and sign the application certification.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This document is signed and dated without a notary; the checklist does not identify any attachment or related step that must be notarized or sworn.

How to submit this form

  1. 1

    Download The Checklist

    Download the Lot Line Adjustment Checklist and Signature Page PDF.

  2. 2

    Complete And Sign

    Review the checklist, complete the owner or authorized-representative certification, and sign and date the application.

  3. 3

    Gather Required Materials

    Prepare the listed drawing, deed, and other applicable materials; Type II applications also require a tax parcel and owner list for properties within 300 feet.

  4. 4

    Submit To The City

    Submit the checklist and application materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Lot Line Adjustment Checklist cover?
It lists materials for the initial application, including a preliminary survey drawing, property deed, and other items depending on the application and site.
Do I need a notary for the Lot Line Adjustment Checklist?
No. The document calls for signatures and dates but has no notary block or notarized attachment requirement.
How do I submit the Lot Line Adjustment Checklist?
The document does not provide submission instructions or contact details. Submit it to the city department named on the form; check the city website for current contact details.
What happens after the lot line adjustment is approved?
The checklist says final documents must be submitted for review and approval within 90 days. It also states that the final drawing must be prepared by a licensed surveyor and the survey recorded at the applicant’s expense.

Need something notarized?

This Lot Line Adjustment Checklist and Signature Page doesn’t need a notary — but if you have another Port Townsend form that does, a commissioned online notary can help.