Port Townsend, WA · Jefferson County

No notary required

Street and Utility Development Permit Application

Property owners or authorized representatives use this application to request a Port Townsend permit for street or utility development work.

What this form is

The application requests information about the applicant, property, contractor, proposed work, disturbed area, stormwater overflow, and impervious surface. Its checklist says the application is incomplete unless all items are checked or marked N/A. Required materials include a construction cost estimate, vicinity map, two copies of a site plan, and, for certain projects, three plan sets prepared by a licensed civil engineer.

Who needs it

Property owners or authorized representatives proposing street or utility development work in Port Townsend use this application and provide the listed checklist materials.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated without a notary; it lists no notarized or sworn attachment, so the owner or authorized representative simply signs and dates it.

How to submit this form

  1. 1

    Download the Application

    Download the Street and Utility Development Permit Application PDF.

  2. 2

    Complete the Application

    Enter the applicant, property, contractor, and proposed work information, then sign and date the certification.

  3. 3

    Gather Checklist Materials

    Check or mark N/A for each checklist item and gather the required estimates, map, site plan, and any applicable plan sets.

  4. 4

    Submit to the City

    Submit the completed application and materials to the city department named on the form; check the city website for current contact details.

Frequently asked questions

What does the Street and Utility Development Permit Application ask for?
It asks for applicant, property, and contractor details, a description of the proposed work, and information such as disturbed area and impervious surface.
What materials must accompany the application?
The checklist calls for a construction cost estimate, vicinity map, and two copies of a legible site plan. Certain water, sewer, or street projects also require three plan sets prepared by a licensed civil engineer.
How do I submit the Street and Utility Development Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.
Do I need a notary for the Street and Utility Development Permit Application?
No. The application is signed and dated without a notary, and it lists no notarized or sworn attachment.

Need something notarized?

This Street and Utility Development Permit Application doesn’t need a notary — but if you have another Port Townsend form that does, a commissioned online notary can help.