Bothell, WA · King County

No notary required

Boundary Line Adjustment

This checklist outlines the materials property owners and applicants must provide when submitting a boundary line adjustment application to Bothell.

What this form is

Use this checklist to assemble the minimum materials Bothell needs to accept a boundary line adjustment application for further processing. It lists survey map content and supporting items, including a current title report, lot closure calculations, and legal descriptions. The city states that an owner’s declaration is signed and acknowledged after the map sheets are approved during review.

Who needs it

Property owners and applicants seeking a boundary line adjustment in Bothell use this checklist to prepare the required application materials.

How to submit it

Submit the application online through MyBuildingPermit.com by selecting Land Use > Any Project Type > Land Division > Boundary Line Adjustment. The city says a hard copy of the signed map is submitted after departmental review and approval.

About notarization

This checklist itself is signed without a notary; after map approval, the separate owners’ declaration must be signed and acknowledged before a notary public.

How to submit this form

  1. 1

    Download The Checklist

    Download the Boundary Line Adjustment checklist to review the required application elements.

  2. 2

    Prepare The Application

    Arrange for the boundary line adjustment map and required survey information to be prepared by a licensed land surveyor.

  3. 3

    Gather Supporting Materials

    Gather the current title report, lot closure calculations, final legal descriptions, and any draft covenants, if applicable.

  4. 4

    Submit Online

    Submit through MyBuildingPermit.com under Land Use > Any Project Type > Land Division > Boundary Line Adjustment.

Frequently asked questions

Do I need a notary for the Boundary Line Adjustment?
No, not for this checklist. It says the separate owners’ declaration is signed and acknowledged before a notary after the map sheets are approved during review.
How do I submit a Boundary Line Adjustment application?
Submit online through MyBuildingPermit.com: select Land Use, Any Project Type, Land Division, then Boundary Line Adjustment. The city also requires a hard-copy signed map after departmental review and approval.
What materials does the checklist identify?
It lists survey map requirements and supporting materials such as a current title report, lot closure calculations, final legal descriptions, and a draft of proposed covenants, if any.
When does the city make a completeness determination?
The document says the city will take up to 28 days to make a completeness determination.