Bothell, WA · King County

No notary required

Final Plat & Specific Binding Site Plan

This intake checklist helps applicants submitting a final plat or specific binding site plan to Bothell confirm the required application materials are included.

What this form is

Use this checklist when submitting a final plat or specific binding site plan application to Bothell. It lists application materials, map and survey requirements, required certificates, and additional submittal items; the city says other items may also be required. The applicant checks the included items, and items marked for labeling must be labeled for file identification.

Who needs it

Applicants submitting a final plat or specific binding site plan to Bothell use this checklist to prepare the required application package.

How to submit it

The document requires an online application through www.MyBuildingPermit.com. An application fee is due at submittal; see the Land Use and Planning Fees form C.

About notarization

This checklist is signed without a notary; it lists notary certificates as a requirement for the plat map, but gives no notarized or sworn attachment step.

How to submit this form

  1. 1

    Download The Checklist

    Download the Final Plat & Specific Binding Site Plan checklist.

  2. 2

    Complete The Application

    Complete the application form and check each applicable item under the Applicant heading.

  3. 3

    Gather Required Materials

    Gather the listed maps, reports, calculations, forms, and other project materials; contact the appropriate department about items you believe do not apply.

  4. 4

    Submit Online

    Submit the online application at www.MyBuildingPermit.com. The application fee is due at submittal.

Frequently asked questions

What is the Final Plat & Specific Binding Site Plan checklist?
It lists the minimum application materials and mapping requirements for a final plat or specific binding site plan submittal to Bothell.
Who uses this checklist?
Applicants preparing a final plat or specific binding site plan application use it to check that required items are included in the submittal.
How do I submit the application?
The document says an online application is required and directs applicants to www.MyBuildingPermit.com. It also says an application fee is due at submittal.
Do I need a notary for this checklist?
No. This checklist is signed without a notary. It lists notary certificates as a requirement for the plat map, but does not specify a notarized or sworn attachment step.

Need something notarized?

This Final Plat & Specific Binding Site Plan doesn’t need a notary — but if you have another Bothell form that does, a commissioned online notary can help.